Title:
|
CU-123-20: Metro Wastewater Reclamation District is requesting a conditional use permit for a 6.4 mile long wastewater pipeline project, along Second Creek, known as the Second Creek Interceptor (Extends from E. 81st Ave. and Tower Rd to E. 120th and Wheeling Street) and the extension of the existing Sand Creek Interceptor an additional 0.8 miles (near E. 64th Ave. and York St.). The proposed route can be found at the web address listed below.
www.metrowastewater.com/know/secondcreek/pages/default.aspx.
|