File #: Res 2019-56    Version: 1 Name:
Type: Resolution Status: Passed
File created: 5/17/2019 In control: City Council
On agenda: 6/3/2019 Final action: 6/3/2019
Title: RESOLUTION APPROVING GRANT OF A DRAINAGE EASEMENT TO PASS PUBLIC STORM DRAINAGE THROUGH A NEXUS AT DIA TECH CENTER
Attachments: 1. Resolution, 2. Exhibit A: Storm Drainage Easement, 3. Staff Memo

Title

RESOLUTION APPROVING GRANT OF A DRAINAGE EASEMENT TO PASS PUBLIC STORM DRAINAGE THROUGH A NEXUS AT DIA TECH CENTER

 

Body

Summary and Background InformationThis item will approve a permanent drainage easement to the City from DIA Tech Center LLC. The easement is needed to drain City rights-of-way through private property to a storm detention pond.  DIA Tech Center LLC is developing the DIA Tech Center site from Tower Road to Buckley Road and from East 81st Avenue to the south side of Second Creek. The easement is needed to drain storm water from City owned streets through private property to enter a detention pond that ultimately flows to Second Creek. Within the easement, there will be a concrete headwall, wingwall, outfall structure, riprap, graded channel, drop structures, filter fabric, and landscaping. The channel will be used to convey storm water safely to the detention pond and then through the outlet structure to Second Creek. The developer will be responsible for constructing and maintaining all improvements with the easement.

 

Staff Responsible (Department Head):  Joe Wilson, Director of Public Works

Staff Member PresentingLee Alverson, Development Review and Coordination Engineer

 

Financial Impact:  $N/A

Funding Source:  N/A

 

Staff RecommendationApproval of resolution

 

Suggested MotionI move to approve Resolution #2019-56