File #: Res 2023-128    Version: 1 Name: A Resolution Authorizing Award of a Contract for Construction of the Colorado Boulevard Bicycle & Pedestrian Improvements to Colorado Paving, Inc.
Type: Resolution Status: Passed
File created: 11/2/2023 In control: City Council
On agenda: 12/18/2023 Final action: 12/18/2023
Title: A RESOLUTION AUTHORIZING AWARD OF A CONTRACT FOR CONSTRUCTION OF THE COLORADO BOULEVARD BICYCLE & PEDESTRIAN IMPROVEMENTS TO COLORADO PAVING, INC.
Attachments: 1. Council Communication, 2. Resolution 2023-128, 3. Agreement, 4. Presentation

Title

A RESOLUTION AUTHORIZING AWARD OF A CONTRACT FOR CONSTRUCTION OF THE COLORADO BOULEVARD BICYCLE & PEDESTRIAN IMPROVEMENTS TO COLORADO PAVING, INC.

 

Body

Summary & Background

 

The City applied for and received a grant through the DRCOG/CDOT Safer Main Streets (SMS) Program. The City was awarded the grant in December of 2020. This program funds infrastructure projects improving safety and accessibility along urban arterials, especially for vulnerable users who depend on a reliable urban street network, such as pedestrians, bikers, motorcyclists, transit users, the elderly, and those with disabilities.

 

The City's project consists of roadway improvements to Colorado Boulevard from E. 68th Avenue to E. 70th Avenue for the purpose of providing bicycle and pedestrian connectivity through sidewalks and bicycle paths to the light rail station near Colorado Boulevard and E. 70th Avenue.  The anticipated outcome will improve efficiency and safety for pedestrians and bicyclists in the area as well as provide new pavement for motorized vehicles.

 

The project scope includes asphalt paving improvements to Colorado Boulevard from E. 68th Avenue to E. 70th Avenue including concrete curb and gutter on each side of the travel lanes. Multimodal facilities will be provided through a 6-foot wide concrete sidewalk on one side of the roadway and a 10-foot wide bike path on the other side.  Drainage improvements and street lighting will be included in the project.

 

The engineering design and right-of-way acquisitions have been completed. Michael Baker, Inc. is the design engineer and will assist the City with construction management.

 

The City advertised this project for request for bids from October 24, 2023 to November 14, 2023. The City received seven bids from contractors (see attached bid tabulation). The lowest responsible bidder was Colorado Paving, Inc. with a bid of $3,056,885.24.

 

Staff Responsible (Department Head):  Shawn Poe, PE, CFM, City Engineer

 

Staff Presenting:  Shawn Poe, PE, CFM, City Engineer

 

Financial Impact:  The estimated cost for this project is below:

 

 

PROJECT USES

AMOUNT

Engineering Contract

$485,871.32

Engineering Amendment #1 (additional costs for ROW acquisition)

$153,637.00

Engineering Amendment #2 (extend contract time)

$0.00

Engineering Amendment #3 (additional costs for construction management)

$51,702.07

Geotechnical Testing (estimated)

$72,228.00

Right-of-Way and Easement Costs

$9,240.00

Construction Cost and what is being awarded on the 18th

$3,056,885.24

ESTIMATED TOTAL PROJECT USES

$3,829,563.63

 

 

PROJECT FUNDING SOURCES

AMOUNT

CDOT Grant

$2,720,000.00

2021 CIP

$100,000.00

2022 CIP (CDOT grant match)

$680.000.00

2024 CIP

$350,000.00

TOTAL FUNDING SOURCES

$3,850,000.00

 

 

Difference (-below budget/+over budget)

-20,436.37

 

 

Funding Source:  The City’s portion of the funding will be from the Colorado Boulevard Bicycle and Pedestrian Account CIP budget.

 

Staff Recommendation:  Approve A Resolution Authorizing Award of a Contract for Construction of the Colorado Boulevard Bicycle & Pedestrian Improvements to Colorado Paving, Inc.

 